TCI InsiderRequest access
TCI Insider Atlas Series · Sold by Drew
Turks & Caicos · Feasibility study for discussion · Private client edition · Updated November 2026

The Causeway Study
Providenciales to North Caicos

A car causeway from Provo to North Caicos, built as a direct open-water line that touches no private land, would cost about $700 million and create roughly $2.2 billion of new land value on North and Middle Caicos. It pays for itself mainly through the land, not the tolls.

Private client study · On request

Inside the study

A private client study

The Causeway Study is shared with private clients, one person at a time. Ask for access and Drew will send you a personal link.

  • The Crossing
    The corridor is the one the ferry runs: Leeward on the east tip of Provo to Sandy Point on North Caicos, about 14 miles. The banks in between are only 3 to 6 metres deep, so most of the crossing can be cheap rock-fill embankment rather than bridge. The one open question is the exact line, because several of the cays in the way are privately owned or protected.
  • What It Costs To Build
    The per-km figure is not plucked from the air. It is set against real marine crossings that have actually been built, escalated to today's money. The direct route lands at the bottom of that range, and deliberately so. The Caicos banks are only 3 to 6 metres deep, so most of the line is rock-fill embankment, which is cheap, rather than the piled viaduct or high-level bridge that made the deep-water crossings expensive.
  • The Price Gap That Drives Everything
  • The Land Being Re-Valued
    The entire southern half of both islands is low wetland inside the 144,747-acre North, Middle and East Caicos Ramsar reserve, so none of it is in play. Development sits on the northern coastal corridor. Starting from the published land area, the model sizes the developable land, splits it into beachfront, near-coast and interior, and applies rates consistent with your Atlas.
  • The Uplift
    A fixed link does not turn North Caicos into Provo, since Provo keeps the airport and the jobs. What it removes is most of the penalty for being hard to reach. The model applies one re-rating multiple per island: 2.5 times for North Caicos, where the causeway lands and which is closest to Provo, and 1.8 times for Middle Caicos, which is further out but would at last be reachable by car.
  • Cost Against Value Created
    Even at the pessimistic end, a worst-case direct build against a modest re-rating, the uplift comfortably covers the cost. At the base case it is about 3.1 times the direct build. The figure to keep in mind is that this is gross land value created on North and Middle, before any Provo offset, and not cash in anyone's account. Before getting to who captures it, it is worth testing how well the whole picture survives its own uncertainty.

Already have a private link? Open it on this phone or computer and the study opens here.

Common questions

How much would a causeway from Providenciales to North Caicos cost?

This illustrative feasibility model puts a direct open-water line at about $700 million, and roughly $2.2 billion of new land value on North and Middle Caicos. It is not an engineering estimate, a formal appraisal, or investment advice. Figures are order-of-magnitude and move with the assumptions.

How far is it from Providenciales to North Caicos?

The corridor is the one the ferry runs: Leeward on the east tip of Provo to Sandy Point on North Caicos, about 14 miles. The banks in between are only 3 to 6 metres deep.

How do I see the full study?

The full Causeway Study, with its interactive maps, every picture and all the figures, is a private client study. Ask Drew Scrymgeour for access and he will send you a personal link.

Drew ScrymgeourLuxury Real Estate Specialist · Christie’s International Real Estate Turks & Caicos
+1 649 333 3332 · drew@tcibrokers.com · More studies on TCI Insider

TCI Insider is built by THRIVE.